ABOUT US
VISION
To be recognized as a reputable highway operator by 2030
MISSION
Making SDE a pleasant route for users, by
1. Operating and maintaining SDE in a professional, cost effective and sustainable manner
2. Ensuring smooth and safe flow of traffic
3. Fulfilling the expectations of stakeholders
While caring for the community and the environment
Senai-Desaru Expressway Berhad is the concessionaire for the 77km long Senai-Pasir Gudang-Desaru Expressway Project (“E22”) in the southern state of Johor, Malaysia. The expressway is also the fourth longest highway concession awarded by the Malaysian Government.
The works for this project involves the engineering and construction of 6 interchanges, 1 intersection, 4 toll plazas, 2 Rest & Service Areas and also the landmark bridge across Sg Johor. The expressway alignment traverses through Senai, Ulu Tiram, Layang Reservoir, Pasir Gudang and Penawar/Desaru. E22 will be the main connector from the east to the west of Johor.
Our Sg. Johor bridge - The construction of the 1.7km long landmark bridge with 500m main span cable-stayed across Sg. Johor is lead by Design & Build Contractor, Ranhill Engineers & Constructors Sdn Bhd. The two main pylon structures for this bridge each have a height of 150m.